Pyrolysis main furnace, main furnace chamber, heating system skid including heavy oil combustion gun '4, exhaust gas combustion gun 8, fan '1, front feeding system high-temperature sealed feeding system, elevator, nitrogen system, rear slagging system including slagging system screw,water-cooled jocket screw, 2 sets of steam separation skid including dynamic and static sealing body,compensator, heavy oil tank, 2 sets of condenser skid including condenser '6, transfer storage tank3, oil pump, 2 sets of combustible waste gas treatment system skid including water seal, dehydration tank, overflow tank, damping tank, residual heat recovery system, spray tower #3, activated carbon adsorption box, dust collector, air blower Machine, diaphragm sedimentation tank on-site civil engineering, waste gas combustion chamber on-site civil engineering, distribution cabinet, circulating water tank, cooling tower,circulating water pump,etc.
| Main Furnace Size | Φ2600×16000 |
| Applicable Raw Materials | Coal tar residue, etc. |
| Processing Capacity | 30‑50 tons/day |
| Working Pressure | Atmospheric pressure |
| Working Temperature | ‑20‑400℃ |
| Floor Area | 50m×30m |
| Total Power | 125KW |
Maintain a leading position in industry technology, drive industrial development, and deliver better products to serve customers.