Pyrolysis main furnace, main furnace base heating system (including heavy oil combustion gun2, exhaust gas combustion gun4, fan 1, steam pack including rear slag system screw, dynamic seal, compensator), condenser (including blocking dust damping tank, water tank condenser1, transfer storage tank1, oil pump 1, spray tower2, fan, sedimentation tank (on-site construction), combustible waste gas treatment system (including water seal, dehydration tank, overflow tank, small damping tank 3), exhaust combustion chamber (on-site construction), power distribution cabinet, circulating pool, cooling tower, circulating water pump, etc.
| Main Furnace Size | Φ2600×7700 |
| Applicable Raw Materials | Waste tires |
| Processing Capacity | 10‑12 tons per furnace |
| Working Pressure | Atmospheric pressure |
| Working Temperature | ‑20‑400℃ |
| Floor Area | 12m×24m |
| Total Power | 38KW |
Maintain a leading position in industry technology, drive industrial development, and deliver better products to serve customers.